Project Name | Beijing maker town | Project Introduction | 1. A large main screen on the front |
---|---|---|---|
Project Date | 2022.04 | Equipment used | KS9000,ES4 x 6,G612*90 |
Project Location | Beijing | Project Requirements | 1. Centralized computer control 2. One click call of three screens 3. The middle 16:9 picture needs to be clear |
View all cases
-
Tangshan Kailuan tourist area service desk
Project Name:Tangshan Kailuan tourist area service desk
Project Date:2021.04
Project Location:Tangshan City, Hebei Province
Project Introduction:1. A large screen at the front door with a resolution of 3840 * 2176 2 There are five square column screens in the inner hall, and the resolution of each column is 1536 * 832 3 There is a background screen behind the bar with a resolution of 2816 * 576 4
-
Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Name:Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Date:2021.05
Project Location:Shanghai
Project Introduction:1. Two screens are used in the project, and specific materials are played point-to-point, clear and undamaged. The Cassida control system ensures the perfect effect of the exhibition hall.
-
Weifang xiguanting village exhibition hall
Project Name:Weifang xiguanting village exhibition hall
Project Date:2020.11
Project Location:Weifang, Shandong
Project Introduction:One arc giant screen, seven long vertical screens, and three large screens of sand table.
-
Fujian Xiamen International Center
Project Name:Fujian Xiamen International Center
Project Date:2022.02
Project Location:Xiamen City, Fujian Province
Project Introduction:Vertical arc screen
-
An exhibition hall in mumbai, India
Project Name:An exhibition hall in mumbai, India
Project Date:2020.01
Project Location:Mumbai, India
Project Introduction:11 LCD screens are irregularly spliced
-
Baishi Golden Valley Exhibition Hall naked eye 3D
Project Name:Baishi Golden Valley Exhibition Hall naked eye 3D
Project Date:2021.03
Project Location:Beijing
Project Introduction:1. Through the way of modeling screen (left, middle, right and bottom, four screens), 2 Through the division and reorganization function of F2 server, the video is corresponding to four screens one by one to make 3D effect.
-
Chongqing Wushan Motianling Immersion Project
Project Name:Chongqing Wushan Motianling Immersion Project
Project Date:2022.06
Project Location:Chongqing City
Project Introduction:1.2 Immersive point-to-point display on the panel 2. Tablet cloud control
-
Beijing army aviation academy
Project Name:Beijing army aviation academy
Project Date:2020.01
Project Location:Beijing
Project Introduction:P3,4608×832
-
Jilin University Town studio
Project Name:Jilin University Town studio
Project Date:2021.12
Project Location:Jilin City, Jilin Province
Project Introduction:Side screen 1280 × 2048 two, main screen 5440 × 2048, total resolution 8000 × 2048.